Military and Strategic Journal
Issued by the Directorate of Morale Guidance at the General Command of the Armed Forces
United Arab Emirates
Founded in August 1971

2019-11-14

OPIR GEO Satellite Programme Completes PDR

The Next Generation OPIR Geosynchronous Earth Orbiting (GEO) satellite programme, commonly referred to as NGG, achieved a major milestone by completing its system/ground and space vehicle preliminary design review (PDR) in September. Next Generation OPIR will provide a capable and defensible space-based global missile warning capability against emerging threats.
 
As the U.S. Air Force pushes for rapid delivery of the first NGG satellite for launch by 2025, this milestone highlights the fact that the programme is on track and will now proceed with a 12-month PDR campaign at the subsystem and component level. 
 
“The combined government and contractor team has demonstrated its ability to move with deliberate speed over the past 18 months while maintaining the technical and programmatic rigor needed to ensure success. I am pleased with the progress we have made and look forward to the remainder of the PDR campaign over the next year,” said Col. Dennis Bythewood, the Space and Missile Systems Center’s programme executive officer for Space Development.
 
He added: “NGG is a critical piece of our missile warning architecture that will deliver a capable system to counter determined adversaries. While the programme acceleration to meet this threat head-on created a near-term funding shortfall, Congress’s support of the DoD’s US$161M reprogramming request has kept the programme on-track and I am confident we will close the remaining shortfall in FY20 to enable delivery of our first satellite in 2025.”
 
The first block of the Next-Generation OPIR constellation will include five satellites, three of which will be in geosynchronous orbit and two will be in polar orbit. NGGs-1/2/3 will leverage the Lockheed Martin (LM) 2100 common satellite bus used across multiple Lockheed Martin programmes and mission areas. Lockheed recently enhanced the LM 2100 to add capabilities that benefit multiple mission areas, including OPIR. Bus enhancements include elimination of obsolescence and insertion of modern electronics in multiple subsystems, as well as increased resiliency capabilities that are all applicable to the Next Gen OPIR mission.
 
Col. Ricky Hunt, the Next Generation OPIR Space Segment Program Manager stated, “This review demonstrated that the Next Generation GEO programme’s preliminary design meets the missile warning performance required to operate in a robust and competitive environment versus advanced adversary threats. The review was a key milestone demonstrating our readiness to move forward; enabling the build and integration of engineering design units (EDUs) for critical subsystems and procurement of critical long-lead flight hardware for a 2025 first Space Vehicle delivery. These EDUs are key enablers to demonstrate subsystem capabilities and exercise key integration activities that will burn down programme risk before the space flight hardware is delivered.”
 
Air Force Space Command’s Space and Missile Systems Center, located at Los Angeles Air Force Base in El Segundo, California, is the U.S. Air Force’s Center of Excellence for acquiring and developing military space systems. Its portfolio includes the Global Positioning System, military satellite communications, defence meteorological satellites, space launch, range systems, satellite control networks, space-based infrared systems and space situational awareness capabilities.

Add Comment

Your comment was successfully added!

Visitors Comments

No Comments

Related Topics

Thales to Secure Oman’s Newest Airports

Read More

Brimstone to Offer Logistical Advantages to UK

Read More

Mbombe 4x4 Certified One of the Best Protected Armoured Vehicles

Read More

Yugoimport–SDPR Brings Innovations to the Spotlight

Read More

World’s Most Unstoppable Vehicle Launched in Nigeria

Read More

BAE Systems’DLE Upgrade Modernizes F-16 Fleet

Read More
Close

2024-04-02 Current issue
Pervious issues
2017-05-13
2014-03-16
2012-01-01
2014-01-01
2021-06-01
2021-02-21
2022-06-01
2021-09-15
.

Voting

?What about new design for our website

  • Excellent
  • Very Good
  • Good
Voting Number 1647