Military and Strategic Journal
Issued by the Directorate of Morale Guidance at the General Command of the Armed Forces
United Arab Emirates
Founded in August 1971

2024-09-10

Bell’s FLRAA Programme Advances with Milestone B Approval

Bell Textron Inc., a Textron Inc. company, recently announced that the United States Army has approved the Milestone B decision for the Future Long Range Assault Aircraft (FLRAA), marking the beginning of the weapon system’s Program of Record (PoR).
 
The Milestone B decision is a part of the Major Capability Acquisition process and comes after years of the Bell team working alongside the U.S. Army and Bell’s FLRAA teammates to decompose requirements, reduce risk and inform the weapon system acquisition.

This includes the execution of the Preliminary Design Review (PDR), ensuring integration and effectiveness of the aircraft’s design, including weapon system design, sustainment and system integrations that are integral to the U.S. Army’s special mission requirements.
 
Following the U.S. Army’s FLRAA contract award in December 2022, Bell established several new facilities and innovative manufacturing processes to drive cost, schedule, and performance to support the programme’s execution. As Bell and the FLRAA team enter the EMD phase, Bell’s focus will be on continued design maturation and prototyping.

By utilising mature tiltrotor technology coupled with an innovative digital engineering approach and an open architecture, it will be a reliable, affordable and high-performing long-range assault.

Add Comment

Your comment was successfully added!

Visitors Comments

No Comments

Related Topics

HOOK3 Radio Comes to the Rescue in Simulated Mission

Read More

Ministry of Defence Under-Secretary receives delegation of India's National Defence College

Read More

International Space Station mission carrying first Emirati astronaut launched successfully

Read More

Soveron Rohde & Schwarz Delivers Technological Independence

Read More

UAE’s NSSTC and NASA Discuss Research Cooperation

Read More

Prototype of Zero-Emission Electric Commuter Aircraft Completed

Read More
Close

2025-11-05 Current issue
Pervious issues
2017-05-13
2014-03-16
2012-01-01
2014-01-01
2021-06-01
2021-02-21
2022-06-01
2021-09-15
.

Voting

?What about new design for our website

  • Excellent
  • Very Good
  • Good
Voting Number 1647